Bathroom and WC Renovation

Service

Bathroom and WC Renovation

Rahatlama ve estetiğin kusursuz uyumu. Bathroomnuzu lüks ve konforlu bir dinlenme alanına çeviriyoruz.

Free survey

Service Areas Kadıköy, İstanbul
Survey Free survey
Bathroom and WC Renovation

Bathroom renovationnın görünmeyen kısmı yalıtım ve eğimdir. Göztepe ve Erenköy’deki 40 yıllık apartmentlerde ilk iş, mevcut installationn kontrolüdür. Seramik seçimi bundan sonra yapılır.

Bathroom design armatür, ayna ve aydınlatmayı kapsar; renovationde waterproofing da değiştirilir. 3–5 m²’lik hacimlerde concealed cistern ve duş alanı on-site measurementye göre yerleştirilir.

Service

Scope of work

  • Mevcut seramik ve MEP strip-outü
  • Waterproofing ve eğim
  • Gömme rezervuar
  • Seramik / armatür
  • Havalandırma

Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.

Request a survey for this job

Transparency

Our Transparent Pricing Policy

All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.

Included

  • Seramik ve mevcut MEP strip-outü
  • Waterproofing ve zemin eğimi
  • Gömme rezervuar ve duş teknesi
  • Seramik döşeme ve derz
  • Armatür, ayna ve havalandırma montajı

Excluded

  • Kolon hattındaki bina ortak MEP arızaları
  • Küvet, duşakabin gibi seçime bağlı ürün bedelleri

From experience

Waterproofingnı atlamak ya da kurumasını beklemeden seramik döşemek en pahalı hatadır. Alt kata sızıntı çıktığında iş baştan sökülür. Membranın kuruma süresini takvimde ayrı days olarak tutuyoruz.

Process

Our Project Process

01

Survey

Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.

02

Contract

The scope is fixed in the contract. Any additional work is handled through a written variation order.

03

Site

From strip-out to completion, work is carried out by one coordinated team on a single programme.

04

Handover

A final inspection is carried out against a checklist and the project is completed with a handover record.

Works

Frames from this job

FAQ

Frequently asked

How long does a bathroom take?

One bathroom is 7–12 days; two bathrooms with parallel crews 12–18 days. In 40-year-old flats in Göztepe and Erenköy the first task is opening the existing pipework; tile comes after that.

Can we stay at home during a bathroom renovation?

A one-bathroom flat needs a short off-site shower plan. With two bathrooms we work in sequence — one finishes before the other opens. Water-off hours are written on the survey record.

Is waterproofing included in the price?

The bathroom package includes membrane, falls and outlet levels. Visible tile is not laid without the hidden membrane. Concealed cistern and ventilation are separate survey items.

Is the bathroom survey free?

Yes. Bathroom surveys are free. Shaft, falls and any existing leak are checked on the same visit; the written quote follows.