Electrical Installation

Service

Electrical Installation

Güvenli altyapı çözümleri. Elektrik installation renovation ve aydınlatma sistemleri ile güvenliğinizi sağlıyoruz.

Free survey

Service Areas Kadıköy, İstanbul
Survey Free survey
Electrical Installation

1970’ler apartmanlarında alüminyum hat ve eski pano sistemleri sıklıkla karşılaştığımız bir durumdur. Renovationn güvenlik boyutu bu noktada önem kazanır. Priz sayısı, kitchen hattı ve pano surveyte ayrı ayrı değerlendirilir.

Service

Scope of work

  • Pano kontrolü
  • Hat ve kesit
  • Aydınlatma noktaları
  • Test

Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.

Request a survey for this job

Transparency

Our Transparent Pricing Policy

All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.

Included

  • Survey ve ölçü
  • Uygulama
  • Kontrol
  • Teslim

Excluded

  • Ruhsat gerektiren yapısal değişiklikler

From experience

İşi yazılı kapsam olmadan başlatmak en sık görülen hatadır. Kapsamı, süreyi ve bedeli contractye yazıyoruz.

Process

Our Project Process

01

Survey

Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.

02

Contract

The scope is fixed in the contract. Any additional work is handled through a written variation order.

03

Site

From strip-out to completion, work is carried out by one coordinated team on a single programme.

04

Handover

A final inspection is carried out against a checklist and the project is completed with a handover record.

Works

Frames from this job

FAQ

Frequently asked

Is all apartment wiring replaced?

On a full renovation, yes. On partial work we prioritise the board, the kitchen circuit and risky aluminium runs. In 1970s blocks, cable section and socket count are separate survey items.

How long does electrical work take?

Partial circuits and a board are 3–7 days; full rewire and lighting points 8–15 days. Cables are closed before plaster and paint; a test record is issued at handover.

Are extra-low voltage and lighting included?

Boards and power can be one line, LED drivers and data another. Survey gathers kitchen, wet-room and living points on one drawing so walls are not opened again later.

Is the electrical survey free?

Yes. We open the board cover — no obligation. Risky runs are photographed and the quote is written from that.

Survey

Request a survey for this job