School Renovation
Education yapıları için güvenli ve estetik çözümler. Okul renovation ve interiors projelerini eğitim takvimine uygun şekilde gerçekleştiriyoruz.
Free survey
Okul renovation konut işinden farklı bir takvim ister: yaz tatili, çocuk güvenliği, gece ve weeks sonu vardiyası. Göztepe MEB İlkokulu, Fehmi Ekşioğlu MEB Ortaokulu, Sare Şafak Anaokulu, Perihan Aktürk anaokulu, İnci Yıldız Okulları ve NUN Okulları Beykoz referanslarımız bu deneyimi oluşturur.
Okul renovationde zemin, wet room ve boya; interiorsda ise sınıf ve ortak alan düzeni öne çıkar. Teslim, ders yılı başlamadan tamamlanır.
Service
Scope of work
- Education takvimi ve güvenlik
- Wet room ve zemin
- Boya ve mobilya
- Façade / peyzaj
- Handover record
Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.
Request a survey for this jobTransparency
Our Transparent Pricing Policy
All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.
Included
- Education takvimine kilitli iş programı
- Wet room, zemin ve boya
- Sınıf ve ortak alan mobilya koordinasyonu
- Façade veya peyzaj (kapsama göre)
- Handover record
Excluded
- MEB ve belediye ruhsat bedelleri
- Ders araç-gereç ve teknoloji alımı
From experience
Okulu dönem içinde gürültülü strip-oute açmak en pahalı hatadır. Yaz penceresi ve gece vardiyası surveyte yazılmazsa idare ile çatışılır.
Process
Our Project Process
Survey
Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.
Contract
The scope is fixed in the contract. Any additional work is handled through a written variation order.
Site
From strip-out to completion, work is carried out by one coordinated team on a single programme.
Handover
A final inspection is carried out against a checklist and the project is completed with a handover record.
Works
Frames from this job
FAQ
Frequently asked
Can a school be renovated during term time?
Noisy strip-out and façade work wait for the summer break. Paint and joinery can run on night shifts in term. The programme is written with the administration — the same discipline used on Göztepe MEB and Erenköy jobs.
How long does a school refit take?
A single floor or kindergarten is typically 3–6 weeks; a block façade 4–10. The academic calendar locks the date; that is settled on survey.
Which schools have you worked on?
Göztepe MEB primary (general renovation), Fehmi Ekşioğlu MEB middle school, Sare Şafak kindergarten interiors and landscape, Perihan Aktürk kindergarten landscape, İnci Yıldız Schools façades, NUN Schools Beykoz landscape.
Is the school survey free?
Yes. Surveys of education buildings are free. The appointment with the administration is planned the same week.